Services/Mechanical / Electrical / Plumbing

Building systems.

MEP drafting for mechanical, electrical, and plumbing systems. Plans, risers, details, and schedules that follow your design and fit the rest of the drawing set.

Discuss this work
01

Electrical documentation

Power, lighting, and equipment layouts; supplied circuit and panel information; symbols, notes, and sheet references. Design decisions come from your project team.

02

HVAC documentation

Duct and equipment layouts, sections, details, and schedules based on the specified system. Revisions carried through the affected views and sheets.

03

Plumbing documentation

Domestic water, sanitary drainage, and vent plans; riser diagrams; fixture schedules; and details from the specified design. Pipe sizes, slopes, and connections follow supplied engineering information.

04

Models, sheets, and coordination

Model updates, view setup, annotations, and drawing sheets using your project files. We carry agreed changes through related views and flag conflicts between supplied backgrounds and system layouts for your team to resolve.

What we work from.

  • Current floor plans and project backgrounds
  • Design sketches, markups, or written direction
  • Equipment and fixture information, approved schedules, and system diagrams
  • Drawing standards, sheet list, and required file version

What you receive.

  • Editable drawing or model files in the agreed format
  • PDF sheets for your review
  • Revisions incorporated across the agreed drawing scope
  • A list of open questions that still need a design decision

System sizing, load calculations, equipment selection, and engineering approval remain with the responsible design professional.

Can you work within our existing model?

Yes. Send the project version, linked-file requirements, template, and a description of the work. We confirm the file setup and scope before starting.

Can you revise only part of a drawing set?

Yes. Identify the affected sheets or model areas and provide the markups. The scope should also identify related schedules, sections, and details that need to change.

Have something
in mind?

A short description, the source information you have, and your target date are enough to start the conversation.

Contact CivilFS